This green energy project consists of a new renewable power facility constructed in the Toba Valley on Jimmie Creek, approximately 80 km northeast of Powell River on BC’s Sunshine Coast. The powerhouse connects to the existing 155 km, 230 kV, Toba Montrose transmission line to Saltery Bay, which is the point of interconnection with the BC Hydro system.